Welding and installation to DVS
Thermoplastic piping requires clean welded joints and experienced installers. We work to DVS guidelines and our clients’ specifications.
- Welding of PE, PP, PVC, PVDF and ECTFE to DVS guidelines
- Installation of piping, valves and components
- Modifications and extensions in existing plants
- Prefabrication of smaller assemblies when required
- Support during commissioning

The right plastic for every medium
We work with the thermoplastics commonly used in industrial piping.
PE
Polyethylene – proven in water, wastewater and utility pipelines.
PP
Polypropylene – versatile in chemical and process engineering.
PVC
Polyvinyl chloride – for industrial, water and chemical pipelines.
PVDF & ECTFE
Fluoroplastics for high chemical and thermal requirements.

Clean connections, documented work
We ensure consistently high workmanship – wherever the site is.
- Execution to client specifications
- Compliance with relevant standards and DVS guidelines
- Documented and traceable work processes
- SCC-compliant working methods on site
How your project runs
Coordination with client and project management
Planning and preparation of the deployment
Installation and integration on site
Quality control and documentation
Support during acceptance and commissioning
Questions about thermoplastic piping
Which thermoplastics does Romotech work with?
PE, PP, PVC, PVDF and ECTFE. We carry out welding to the guidelines of the DVS (German Welding Society).
Do you also carry out modifications during operation?
Yes. Modifications and extensions in existing plants are part of our daily work – ideally scheduled around shutdowns and turnarounds.
Can assemblies be prefabricated?
We prefabricate smaller assemblies when required. This shortens installation time on site.
Project planned or need short-term support?
Describe your project – we will get back to you quickly with an assessment.